INFRASTRUCTURE

 

Details of land & building  at the Institute:

1. Total accommodation (sq. meters) Available/ required for the whole Institute as per NCVT norms 577 sq. Mt.
2. Area available in the institute  for Office & Other facilities:
Description  Required as per NCVT Norms Available in the Institute Remarks(mention shortage if any)
Principal Office 20 sq. Mt. 25 sq. Mt. NIL
Office 20 sq. Mt. 22 sq. Mt. NIL
IT Lab 25 sq. Mt. 27 sq. Mt. NIL
Area available in the institute for Workshops & Class rooms:
Name of the Trade Maximum no. of units in one shift only  WORKSHOP CLASS ROOMS
Required as per NCVT norms Actually available Shortage Required as per NCVT norms Actually available Shortage (If any)
Electrician 2 (WS1) 98sq. Mt.

(WS2) 98sq. Mt.

(WS1) 100.03 sq. Mt.

(WS2) 100.68 sq. Mt.

NIL (CR1) 25 sq. Mt.

(CR2) 25 sq. Mt.

(CR1) 27.83 sq. Mt.

(CR2) 27.83 sq. Mt.

NIL
Fitter 2 (WS1) 88 sq. Mt.

(WS2) 88 sq. Mt.

(WS1) 100.22 sq. Mt.

(WS2) 89.73 sq. Mt.

NIL (CR3) 25 sq. Mt.

(CR4) 25 sq. Mt.

(CR3) 30. sq. Mt.

 (CR4) 30. sq. Mt.

NIL
        NIL     NIL

 

 POWER SUPPLY

1 Electrical Connection issued in the name of Master Dwarika Prasad ITI
2 Latest Electricity bill details(enclosed-Units consumed /one year bill)) Bill Enclosed
3 Trade Maximum no. of unit in one shift Power supply required as per norms in KW Power supply available in the Institute  in KW
Electrician 2 2×5.20=10.4 KW 18 K.W.
Fitter 2 2×3.51= 7.02 KW
Total electrical Load 17.42